Multidisciplinary design coordination and information management are fundamental to delivering data centres on time, on budget and without surprises.
Contact Mona Browne
Predictable outcomes, every time.
Data centre projects keep getting bigger, timelines keep getting shorter, and supply chains keep adding complexity. What clients need is a partner who actually delivers.
Design Management is the function that makes that possible. It holds a single point of accountability for turning design intent into something buildable, coordinated, and priced and scheduled with confidence, across every discipline and every vendor on the project.
It isn’t a support function bolted onto the process. It’s the engine room.
What you get
Large, fast moving data centre projects rarely fail because one discipline underperforms. They fail at the seams: where electrical meets mechanical, where structural meets modular, where the spec on paper doesn't match the equipment arriving from the factory. Design Management exists to own those seams.
Power, switchgear, UPS, standby generation and busbar systems are coordinated against capacity, resilience tier and phased build out from day one, and kept in sync with mechanical load and structural containment routing so nothing gets designed in isolation.
Cooling strategy, whether CRAH, CRAC, liquid or immersion, is matched precisely to electrical load and structural capacity. We control the handover between design intent and manufacturer equipment data so procurement never runs ahead of coordination.
Design is built around how the facility actually runs: access, security zoning, equipment replacement routes and future expansion, not just how it looks on day one.
Structural design is sequenced against plant loading and modular or DfMA delivery strategy, so off site fabrication timelines stay protected rather than getting disrupted by late structural changes.
Fire, security, acoustics, controls, sustainability, permitting and authority and utility engagement are built in from the start, each with a named owner and a tracked deliverable.
Every stage is tested through Quality in Design reviews, covering design (VE) optimisation, coordination validation and pre submission QA, with issues ranked by severity and tracked through to closure. Nothing slips through.
Coordination on this scale depends on a shared model environment, not multiple disciplines each working from their own drawings. Building Information Modelling and Management, or BIM, is the common environment where every discipline model is federated, clashes are found early, and design intent stays visible to the whole team rather than sitting in one consultant’s files.
BIM here means more than 3D geometry, eventually this can be used as Digital Twin and Asset Management tool. It is the information management approach behind the model: who owns each element, what stage it needs to reach, and how it gets checked before anyone builds from it. That structure is what catches a clash between a cable tray and a structural beam months before it becomes a site problem, and it is the same structure that underpins ISO 19650, the international standard behind everything below.
Large projects generate huge volumes of design information. Without structure, that becomes noise, and noise is where risk hides. Design Management runs on the ISO 19650 series, the international standard for managing information across the full asset lifecycle.
In practice, that means a BIM Execution Plan on the table within weeks of kickoff, naming and validation standards enforced from the first model upload, a structured Common Data Environment, and information delivery plans that map directly to project decisions rather than habit.
Ad hoc procurement is where design timelines go to die. Design Management runs on a pre qualified network of design consultancies, modular and DfMA manufacturers and specialist vendors, vetted, tested and tied into framework agreements before a project ever needs them.
That’s what turns finding a vendor into deploying a repeatable, standardised design kit, fast.
Fortivum’s Design Management footprint currently covers EMEA, a region where grid connection processes, planning regimes, seismic and climatic conditions, and local construction methods all vary from market to market. A copy paste playbook doesn’t survive contact with a new market, so the model adapts without losing consistency.
Fortivum is headquartered in Dublin, Ireland, with an office in Austin, USA. We actively manage projects and provide support across the following locations: